Assembly of Black Liquor Product Gas Fired Boiler
A strategic component of the "Stonechem" black liquor recovery process, this boiler generates steam from two high temperature gas streams produced in the reactor. Both streams enter the boiler at approximately 1250° F. The size of the boiler negated road shipment. The proximity of MBB's assembly facilities to the Welland Canal allowed this unit to be shipped by water.

|
|
|