Stack Installation
MBB Power Services Inc. successfully relocated IOL's F-851 Furnace which required five separate critical lifts in a live operating plant. All critical lifts were completed using a single 500 ton hydraulic crane which also required working from crane manbaskets. A temporary work platform was erected on the stack at an elevation of 135' above grade to provide access for the welding of lifting lugs and high pressure water cutting of the refractory lined stack. All work was completed ahead of schedule and without a single incident or first-aid.

|
|
|